LOCATION: SPAIN

CLIENT: Confidential

AREA: 28 Km

BUDGET: 179,9 M € (total cost)

We participated in the development of a high-speed railway section designed for double standard-gauge track, as part of a strategic improvement in regional connectivity. The route crosses areas of high environmental sensitivity, including aquifers, and incorporates tunnels, viaducts, and overpasses with significant technical complexity. The project is divided into three subsections, each at different stages of progress.

ACTIVITIES

ACTIVITIES

  • We generated parametric typical sections to improve the adaptability of the BIM model to changes indicated by the design team, thereby reducing delivery times.
  • We modeled the deck, piers, footings, shaft, and abutments in Revit according to the design team’s specifications.
  • We produced drawings from the Revit model, adding construction details to ensure proper execution on site.
  • We federated topographic models, installations, technical rooms, stations, railway layout, catenaries, etc., all georeferenced in IFC format.
  • We coordinated models from different software platforms involved in the project, such as ISTRAM and Civil 3D, to ensure efficient and accurate integration of all elements.