LOCATION: UNITED KINGDOM
CLIENT: Confidential
LENGHT: 230 Km
BUDGET: 67 M £
We participated in Phase 1 of a major high-speed rail development in the United Kingdom, connecting two large urban centers through an infrastructure of approximately 230 kilometers. The project aims to improve transport capacity and significantly reduce travel times.
ACTIVITIES
ACTIVITIES
- Implementation of PAS 1192 standards in the working environment, ensuring quality and interoperability in the production of models and technical documentation.
- BIM modeling of specific structures using AECOsim, and technical buildings with Revit, optimizing multidisciplinary integration.
- Workflow coordination between different platforms (Revit, AECOsim), ensuring efficiency in information management.
- Use of ProjectWise as a common data environment for centralized document management, facilitating real-time collaboration.